Programs details of infrastructure department
This data represents the progress report of the infrastructure department of the Tulsipur sub metropolitan city. The sheet one represents multi-year project and the sheet two represents the program contracted in the fiscal year 2079/80 along with their progress till date.
Data and Resources
Infrastructure Department Progress Report
This data represents the progress report of the infrastructure department of the Tulsipur sub metropolitan city. The sheet one represents multi-year project and the sheet two represents the program contracted in the fiscal year 2079/80 along with their progress till date.
आ.व. २०७७/०७८ मा ठेक्का भै आ.व. २०७९/०८० मा सारिएका योजनाको प्रगती प्रतिवेदन
आ.व. २०७७/०७८ मा ठेक्का भै आ.व. २०७९/०८० मा सारिएका योजनाको प्रगती प्रतिवेदन सडक कालोपत्रे तथा नाला निर्माण,भवन निर्माण ,पुल तथा कल्र्भट निर्माण अन्र्तगतको विवरण उल्लेख गरिएको छ।
आ.व. २०७९/०८० मा ठेक्का सम्झौता भएका योजनाको प्रगती प्रतिवेदन
It represents the data of the plans and programs that were planned and the progress achieved in the FY 2079/80.